THE MANAGEMENT EQUIPMENT AND MATERIALS WORKSHOP PRAKTICE STONEBUILDING AN IMAGE TECHNICAL EXPERTISE PROGRAM AT SMK NEGERI 2 DEPOK SLEMAN GOES TO SBI IN 2010/2011.

Wawan, Riyanta (2011) THE MANAGEMENT EQUIPMENT AND MATERIALS WORKSHOP PRAKTICE STONEBUILDING AN IMAGE TECHNICAL EXPERTISE PROGRAM AT SMK NEGERI 2 DEPOK SLEMAN GOES TO SBI IN 2010/2011. S1 thesis, UNY.

[img]
Preview
Text
THE_MANAGEMENT_EQUIPMENT_AND_MATERIALS_WORKSHOP_PRAKTICE_STONEBUILDING_AN_IMAGE_TECHNICAL_EXPERTISE_PROGRAM_AT_SMK_NEGERI_2_DEPOK_SLEMAN_GOES_TO_SBI_IN_2010-11.pdf

Download (101kB) | Preview

Abstract

This study aims at determining the management Equipment and Materials Workshop Practice Stone at SMK Negeri 2 Depok. Management workshop was primarily related to planning, organizing, implementation and supervision. This study is a descriptive study with qualitative data. Research informants were chairman of competence building expertise, head shop, and supporters of the informant; toolman workshop, productive teacher / instructor workshop. Data collection techniques were using observation, interviews, and documentation. The data obtained were analyzed qualitatively in the field while checking the validity of the data was using triangulation techniques. The results showed that Stone Management Workshop at SMK Negeri 2 Depok, has been carrying out management functions consisting of the action plan (planning), organizing (organizing), implementation (actuating), as well as monitoring (controlling). (1) Planning is based on the Education Unit Level Curriculum and be forwarded to the Chairman of the Chief Workshop Skills Program and submitted to the Principal then analyzed by Waka Infrastructures. When planning carried out at the beginning of a new doctrine. (2) The organization has no clear division of tasks. Each staff has a duty respectively. Organizing workshop equipment and material practices involving the Principal, Waka Facilities and Infrastructure, Head of Expertise Programme, Head Shop, Practice Teachers and Technicians. (3) The whole has been running well and organized. procurement phase based on analysis of curriculum and conducted by the department with the approval of Waka Infrastructures, the storage system using a combination of open systems and closed systems, use has been in accordance with the ratio of the number of children and use the inventory numbers for ease of use, and maintenance of equipment and material practices carried out by technicians, teachers and students, the repair is done Waka Infrastructures through the filing of the Head Shop, no credit cards but always be checked before and after use. (4) Supervision is done by building a system of Workshop Technicians reported verbally to the teacher then made a written report subsequently submitted to the Chief of Expertise Programme, Principal and Waka Infrastructures every quarter. The school supervision is also done by direct observation to the garage Keywords: Management, Stone Workshop, SMK N 2 Depok

Item Type: Thesis (S1)
Subjects: Teknik & Teknologi > Teknik Sipil dan Perencanaan
Divisions: Fakultas Teknik (FT) > Pendidikan > Pendidikan Teknik Sipil dan Perencanaan
Depositing User: Eprints
Date Deposited: 26 Jun 2012 06:25
Last Modified: 29 Jan 2019 14:01
URI: http://eprints.uny.ac.id/id/eprint/987

Actions (login required)

View Item View Item