Lumbung Pustaka UNY: No conditions. Results ordered -Date Deposited. 2024-03-28T11:37:27ZEPrintshttp://eprints.uny.ac.id/apw_template/images/sitelogo.pnghttps://eprints.uny.ac.id/2015-05-21T01:59:15Z2019-01-29T22:38:06Zhttp://eprints.uny.ac.id/id/eprint/19112This item is in the repository with the URL: http://eprints.uny.ac.id/id/eprint/191122015-05-21T01:59:15ZMANAJEMEN PERALATAN DAN BAHAN PRAKTIK BENGKEL BATU
PADA BIDANG KEAHLIAN TEKNIK BANGUNAN
DI SMK N 2 DEPOK SLEMAN YOGYAKARTA
MENUJU SEKOLAH BERTARAF INTERNASIONAL
TAHUN AJARAN 2010/2011MANAGEMENT EQUIPMENT AND MATERIALS WORKSHOP PRAKTICE STONE
BUILDING AN IMAGE TECHNICAL EXPERTISE PROGRAM
AT SMK NEGERI 2 DEPOK SLEMAN GOES TO SBI IN 2010/2011.
By :
Wawan Riyanta
NIM. 06505241022
ABSTRACT
This study aims to determine the management Equipment and Materials Workshop
Practice Stone at SMK Negeri 2 Depok. Management workshop was primarily related to
planning, organizing, implementation and supervision.
This study is a descriptive study with qualitative data. Research informants is
chairman of competence building expertise, head shop, and supporters of the informant;
toolman workshop, productive teacher / instructor workshop. Data collection techniques used
are observation, interviews, and documentation. The data obtained were analyzed qualitatively
in the field. While checking the validity of the data using triangulation techniques.
The results showed that Stone Management Workshop at SMK Negeri 2 Depok, has
been carrying out management functions consisting of the action plan (planning), organizing
(organizing), implementation (actuating), as well as monitoring (controlling). (1) Planning is
based on the Education Unit Level Curriculum and be forwarded to the Chairman of the Chief
Workshop Skills Program and submitted to the Principal then analyzed by Waka
Infrastructures. When planning carried out at the beginning of a new doctrine. (2) The
organization has no clear division of tasks. Each staff has a duty respectively. Organizing
workshop equipment and material practices involving the Principal, Waka Facilities and
Infrastructure, Head of Expertise Programme, Head Shop, Practice Teachers and Technicians.
(3) The whole has been running well and organized. procurement phase based on analysis of
curriculum and conducted by the department with the approval of Waka Infrastructures, the
storage system using a combination of open systems and closed systems, use has been in
accordance with the ratio of the number of children and use the inventory numbers for ease of
use, and maintenance of equipment and material practices carried out by technicians, teachers
and students, the repair is done Waka Infrastructures through the filing of the Head Shop, no
credit cards but always be checked before and after use. (4) Supervision is done by building a
system of Workshop Technicians reported verbally to the teacher then made a written report
subsequently submitted to the Chief of Expertise Programme, Principal and Waka
Infrastructures every quarter. The school supervision is also done by direct observation to the
garage
Keywords: Management, Stone Workshop, SMK N 2 DepokRiyanta Wawan Riyanta