Lumbung Pustaka UNY: No conditions. Results ordered -Date Deposited. 2024-03-28T08:40:05ZEPrintshttp://eprints.uny.ac.id/apw_template/images/sitelogo.pnghttps://eprints.uny.ac.id/2015-07-30T07:21:16Z2015-07-31T01:49:58Zhttp://eprints.uny.ac.id/id/eprint/24157This item is in the repository with the URL: http://eprints.uny.ac.id/id/eprint/241572015-07-30T07:21:16ZMonorail and Tram Scheduling which Integrated Surabaya using
Max-Plus AlgebraIn this paper we design monorail and tram scheduling in Surabaya using max-plus algebra. The main steps of this work is that we determine eigenvalue and eigenvector. The eigenvalue is departure period that is 4.6 and eigenvector as early departure time.Fahim Kistosilkfahimt@gmail.comHanafi LukmanSubionosubiono@matematika.its.ac.idAyu Fatma